Susan Stephens for the Board
Election Candidate Form

The Elm at Clark · 2026 Board Election

A board thatshows its work.

Every candidate can read a budget. I build the systems that let you read it too.

Susan Stephens
CandidateSusan Stephens
Unit1108
Resident18 years
Board serviceSince 2020
Current roleSecretary
Offices heldDirector · Secretary · Vice President
CommissionsWebsite · Pool deck · Construction · Hallway
FocusBudget & reserves · Construction · Technology
ProfessionSenior Manager, data & analytics
In technology20+ years
Co-founderGazzebo, a start-up
AlsoOwn LLC · ad hoc technology work
Built for the building3 deliverables

What we are about to spend

The most expensive decade in this building’s history.

Figures as published in prior owner notices and candidate statements.

Façade & windows$25MProjected over the next 20 years
Risers & pipes$14MProjected over the next 10 years
Assessments+35%2023 to 2026, correcting a decade of flat dues

About that 35%. It is not overspending. It is catching up. For roughly a decade before this board, assessments were held close to flat while costs rose and the reserve fund fell behind what the building needed. Pleasant to live under, expensive to inherit. The façade could not wait and the risers cannot wait. This board took the unpopular votes, and I will defend that to anyone who asks.

So the question on this ballot is not whether the work happens, or even what it costs. It is whether you can see how it is being managed.

Built for this building, on my own time

Three things built. None of them adopted.

That is the honest status, and it is another reason why I am running rather than simply finishing my term.

01

A visual companion to the Treasurer’s report

Not adopted

His figures, tied line for line to his own statements, drawn as charts that can be read at a glance while he presents. Never a replacement for his work, just a way to make three pages legible in three seconds. The ask was simply to put it on screen during the report. Ask me and I will walk you through it.

02

A working construction & renovation portal

Not adopted

Built out of my work on the Construction Commission, where I analyzed how renovation approvals actually move through this building. Not a mockup. A live system: renovation applications, contractor insurance and license tracking, inspections, compliance, and project status in one place, so the Board and the Management Office stop rebuilding every project out of old email.

03

A modernized owner portal

Not adopted

A faster, cleaner front door for documents, notices, and requests, built to work on the phone in your hand rather than on a desktop you are not sitting at.

Not everything has stalled. The fçade and balcony project, the largest capital job this building has undertaken, was finished during my time on the Board. On the 8th floor pool deck commission I worked on the furniture package that is out there now: the chaise lounges, the fire pits, the umbrellas, and the tables, a $60,000 reserve line item delivered and in service. I mention both because I am not only the person whose proposals sit unread. When this Board takes something up, it gets built.

All three are available to view. I would rather you judged the work than take my word for it.

If you return me to the Board

What I intend to champion.

  1. A new reserve study, and the budget commission that should drive it.

    The budget commission is kicking off and I intend to serve on it. The bigger ask is this: I want us to commission a new reserve study.

    We are still planning off the 2023 study. It has been revised since, most recently in October 2025, but revising the component schedule is not the same as re-deriving the assumptions underneath it. Open the workbook and the inputs still read current year 2023, construction inflation 4.3%, return on invested reserves 3.42%. The 4.3% was set immediately after the most inflationary stretch in forty years. The 3.42% is above what we are actually earning today.

    Those two numbers decide everything else. The study's component schedule is roughly $46 million of work in today's dollars. Run it at 3.7% and the thirty-year program costs about $87 million. At 4.3%, $97 million. At 5.0%, which tariffs and utility costs make entirely plausible, $110 million. Same building, same work, same study, three answers thirty-three million dollars apart, or roughly $90 to $120 per unit per month. The yield assumption carries another $8 million of assumed interest across the plan, and each half point it is off is worth about a million.

    I am not claiming the study was wrong when it was written. I am saying it is three years old, it has never been re-based, and the two numbers driving a hundred-million-dollar plan are assumptions that no one has tested since. A fresh study, with the sensitivity shown rather than a single line to trust, is the highest-value thing this Association can buy right now.

  2. Spending you can actually see.

    Visual financial reporting presented with every budget, so a double-digit assessment increase never again arrives as a surprise.

  3. A real construction process.

    The portal live for the hallway project and for unit renovations, with permits, insurance, inspections, and accountability tracked in one place.

  4. Diligence before the signature, not after it.

    Structured competitive bidding that begins six months before a contract expires, not six weeks, scored on risk as well as price. Then let the licensed professionals we hire do the work. Renegotiating an agreed contract for months afterward is not late diligence, it is diligence that never happened. Standard trade and wholesale pricing is how design professionals are compensated: disclosed, normal, and not a hidden fee.

  5. Fiber, before the new hallway finishes go in.

    Newer towers around us offer fiber as standard: symmetric speeds, so uploads run as fast as downloads. That is the half that matters if you work from home, take video calls, or back anything up to the cloud, and it is the half this building does not have.

    The hallway project sets the timing. We are not taking walls down, and I am not suggesting we should. But if bringing fiber in calls for wall access, new molding or trim, or work in the risers, that is work you want finished before the new wall coverings, paint and trim go on. Cutting into finishes we have just paid for, in hallways owners have waited years for, is the expensive version of this and the demoralising one.

    So the fiber question should be answered while the hallway scope is still being set. What would fiber to each unit actually cost, asked of our current provider and of the Chicago providers who specialise in buildings like this one, quoted all in with every fee and surcharge included rather than as a headline rate with the rest attached underneath. If the answer is that it is not worth it, that is a fine answer. Not asking until the drywall is finished is not.

  6. Amenity spaces worth booking.

    The reserve study already carries LaSalle Room Improvements as a funded line item in 2027, at a $25,000 allowance. The money is allocated and the year is set. What is missing is execution: real audio and video with a projector, cabinet refrigeration, and a design refresh that brings the room up to the standard of the rest of the building. Done properly it is among the least expensive improvements available to us and among the most used.

  7. A smoking policy owners will actually pass.

    The last attempt did not fail because owners here like secondhand smoke. It failed because it asked owners to vote on an idea instead of on terms, and left too much open to interpretation. I have written the terms: what counts as smoking, where each restriction applies, what happens to residents who already smoke, what establishes that a violation occurred, what it costs, and when it starts.

    It also splits into three decisions rather than one. The Board can adopt a common area rule on its own authority. Only the restriction inside units genuinely belongs to owners, and it should reach them with the exemption terms on the page. And the sealing and corridor door gasketing that reduce smoke moving between units should be scoped into the hallway project while the access is free, because that part helps owners whether or not any restriction ever passes.

  8. A building people live in.

    The holiday party, the summer party, bingo, pumpkin carving. I organize these with the Management Office and I intend to keep doing it.

One commitment, in writing

I am using my expertise to help this building, and I am not paid for any of it.

Not by the Association, not by anyone else, for creating or maintaining any platform I have built for this building. No invoice for my labor, from me or from any company I am part of. If we adopt any of this work, the only cost to the Association is the actual hard cost, meaning compute, hosting, a domain, and any third-party service, billed at cost with receipts and approved like any other expenditure.

I am putting that in writing rather than offering it as an assurance. I am asking you to trust my technical judgment, and you are entitled to know that nothing in it pays me.

I am aware it could be suggested that I stand to gain from this work. I would rather answer that plainly than let it travel. I have received nothing from this Association beyond an unpaid seat on its Board. I have not been hired by it, I have not recommended a firm I hold any interest in, and I have not accepted anything of value from a vendor who does business with it. Every one of those statements is checkable against the Association’s own books and minutes, and I invite any owner to check them.

Why my day job is the right one for this seat

The thing being done here is the thing I build software to do.

I have worked in technology for more than twenty years, in development, engineering, cyber security, data and leadership roles. Today I run data engineering and analytics for a billion-dollar company, where large-scale data analysis is regular work rather than an occasional project: pulling numbers out of systems that disagree with each other, reconciling them, and turning them into something a room of executives can act on. I am accountable there for compliance with the Health Insurance Portability and Accountability Act (HIPAA) and for the governance of very large volumes of personally identifiable information (PII). Before that I spent eleven years at Nokia and HERE Technologies in development, engineering and cyber security, working to General Data Protection Regulation (GDPR) standards, the strictest data privacy regime in force anywhere.

That matters for anything this Association puts online. Protecting other people’s private data is not a hobby of mine. It has been a condition of my employment for over fifteen years.

I am a co-founder of a start-up, Gazzebo, which I architected and built: an AI B2B travel procurement platform whose entire purpose is running competitive bids: putting requirements in front of competing suppliers, normalizing what comes back so every offer can be compared on identical terms, and scoring them against criteria agreed before anyone bids. It runs on agentic AI across multiple models, with conversational search and retrieval-augmented analysis over supplier data, and every comparison it produces carries a risk assessment of the bidder, not price alone.

I also run my own LLC, through which I take on ad hoc technology work. One of those engagements, with Nordic Consulting Group, produced Relay BDC, a consumer-facing AI platform for automotive dealerships built on patented technology that identifies and hijacks consumer traffic at the internet service provider level, leveraging contracts with networks such as Starlink and Xfinity, where part of the work is search visibility (AEO/SEO): whether a business surfaces in conventional search results and in the answers AI assistants now give people directly.

That second skill has a use here too. Newer towers are going up around us, and how The Elm presents itself online is part of what a prospective buyer or renter sees before they ever walk through our door. That is not vanity. It is unit values, and it belongs to every owner in this building.

So when this Association awards a hallway contract, a riser replacement program, or a management agreement: I know what a fair bid comparison looks like, I know what a rigged one looks like, and I know how long a real one takes. That last part is where we keep going wrong. Price is also the easy half of choosing a contractor. Risk is the half that costs you later, and it is the first thing dropped when a decision gets rushed. The cheapest bidder who walks off a job halfway through is the most expensive one we can hire.

Neither company has bid on Association business, and neither ever will while I serve.

I have served six years. I am asking for two more, with a clearer mandate behind the work.

Susan Stephens

Secretary, The Elm at Clark Board of Directors

Daphne, a goldendoodle, lying on a sheepskin rug
And this is Daphne.

She is a goldendoodle, and she has met more of you in the elevator than I have. If you see us in the lobby, say hello. She will insist either way. Note: she will temporarily sell me out for bacon.